wilf Dopp Nelson BC
STRIP OR PERIMETER FOOTING EXCAVATION
LANDSCAPING PRIOR TO TOPSOIL INSTALLATION
TRENCHING ...LEVEL AND STRAIGHT FOR UNDERGROUND UTILITIES
YOUR VISIONS
50 TON EXCAVATOR
ROCK RETAINING WALL
ELECTRICAL AND COMMUNICATIONS TRENCH WITH WARNING TAPE
ROCKWORK
ROCKWALL
100,000 LB DOZER EXPERIENCE
PIER FOOTINGS IN BULK EXCAVATION WITH DRAIN TILE
BACKFILLED PIER FOOTINGS WITH SLAB PREPPED FOR CONCRETE AND EXTERIOR GRADED FOR DRAINAGE
2.5 X 5 FOOT LOC BLOC
SILT FENCE INSTALLED PRIOR TO CULVERT WORK
READY FOR TRANSPORT
BRIDGE REPLACEMENT FOR NELSON NORDIC CLUB
STUMP REMOVAL
LOC -BLOCK RETAINING WALL C/W GEO GRID AND COMPACTION
HILLSIDE /WALKOUT BASEMENT EXCAVATION
ROAD GRAVEL LEVELLED AND GRADED WITH EXCAVATOR BLADE.... NO OTHER MACHINE REQUIRED...
NEW RESIDENTIAL DRIVEWAY trees cleared and roughed in and compacted sub-grade c/w with slope for drainage and ditching
SAME DRIVEWAY with addition of 3/4 '' road aggregate prior to final compaction
SMALL RESIDENCE FOUNDATION EXCAVATION neat ,clean and organized and every bucket filled to capacity translates into money saved!